Warehouse Fit Out
Overview:
Client: Waitrose, Main contractor - Spacepod
Location: Bracknell, Berkshire
Project Details: Full fit out of lighting, emergency lighting, power, air conditioning, contianment, data, fire alarm. The area was being used as storage previously & the client wanted an area to have a test mock shop. The warehouse was a perfect solution, the project took 3 weeks from start to finish. A new lay in ceiling grid was required so that we could install Edge Lighting Services LED light fittings. We decided to use Metway lighting control's so that the client could control the lighting via switch & sensors. New containment was installed around the perimeter of the area ready for the mock shop equipment & above the ceiling for all the cabling to run onto. The fire alarm was already existing but we added new smoke detectors to the system so that there was coverage above the ceiling & below in the ceiling tiles.
















Warehouse Fit Out
Overview:
Client: Waitrose, Main contractor - Spacepod
Location: Bracknell, Berkshire
Project Details: Full fit out of lighting, emergency lighting, power, air conditioning, contianment, data, fire alarm. The area was being used as storage previously & the client wanted an area to have a test mock shop. The warehouse was a perfect solution, the project took 3 weeks from start to finish. A new lay in ceiling grid was required so that we could install Edge Lighting Services LED light fittings. We decided to use Metway lighting control's so that the client could control the lighting via switch & sensors. New containment was installed around the perimeter of the area ready for the mock shop equipment & above the ceiling for all the cabling to run onto. The fire alarm was already existing but we added new smoke detectors to the system so that there was coverage above the ceiling & below in the ceiling tiles.















