Office Floors Refurbishment
Overview:
Client: Durabilis Limited
Location: London Victoria
Project Details: Office floor refurbishment consisted of 4 levels having architrave plasterboard removed, a new suspended ceiling, lighting, air conditioning, floor box re locations & new data cabling.
The architrave plasterboard ceiling was removed to make way for the new air conditioning units in the ceiling. A new suspended ceiling was required to hide the air conditioning units & also new lighting to be put into the suspended ceiling. Along with fire alarm relocation, PA speakers into new metal ceiling tiles. The lighting circuits were removed & new cabling installed with Metway lighting control system on PIR sensors to reduce unnecessary energy being used in unoccupied office spaces.
The project was completed a week before the proposed completion date & provided the main contractor an extra week of moving in office furniture, which resulted in the end client being moved in on time & with no snags.









Office Floors Refurbishment
Overview:
Client: Durabilis Limited
Location: London Victoria
Project Details: Office floor refurbishment consisted of 4 levels having architrave plasterboard removed, a new suspended ceiling, lighting, air conditioning, floor box re locations & new data cabling.
The architrave plasterboard ceiling was removed to make way for the new air conditioning units in the ceiling. A new suspended ceiling was required to hide the air conditioning units & also new lighting to be put into the suspended ceiling. Along with fire alarm relocation, PA speakers into new metal ceiling tiles. The lighting circuits were removed & new cabling installed with Metway lighting control system on PIR sensors to reduce unnecessary energy being used in unoccupied office spaces.
The project was completed a week before the proposed completion date & provided the main contractor an extra week of moving in office furniture, which resulted in the end client being moved in on time & with no snags.