Office Refurbishment Project (2) by N.V. White Ltd   

This office refurbishment consisted of 4 floors having the architrave plasterboard ceiling removed, a new suspended ceiling, lighting, AC, floor box relocations & new structured cabling. 
 
The architrave plasterboard ceiling was removed due to the requirement of air conditioning needing to be installed in the office areas. The air conditioning units required space in the ceiling so before the suspended ceiling was installed we designed & installed a metway lighting control system to future proof the office floors lighting, creating an easy solution to maintain the lighting without having to isolate the lighting circuit every time. The system was commissioned & operated via PIR sensors across the floors to keep unnecessary lighting on when areas are not being used. It also saves on energy consumption, the project was delivered on time & within budget. 
 
 
 
 
 
 